For a list of fees associated with Buildings and Permits see below. Permit fees shall be increased by one hundred percent (100%) for permits obtained after work has been commenced in accordance with Section 108.4.
Permit Fees*(subject to change)spacerspacer spacerspacerspacerspacerspacer| BUILDING PERMITS | | New Construction or Addition b | $75 Minimum $.073 Per square foot of total area a $1,875.00 Maximum | | Alteration or Change of Use b | $50 Minimum $.052 Per square foot of total area a $1,875.00 Maximum | | Accessory Structures c | $30.00 | | Annual b | $30.00 | | DEMOLITION PERMITS | | | Bond (Refundable) | $100.00 Minimum $.052 Per square foot of total area a | | Permit Fee | $30.00 | | EXCAVATION PERMITS | - | | Permit Fee | $30.00 | | Street Replacement Cost | $1.04 Per square foot of total area a | | PLUMBING PERMITS | | | Permit Fee | $30.00 | | MECHANICAL PERMITS | | | Permit Fee | $30.00 | | ELECTRICAL PERMITS | | | Permit Fee | $30.00 | | FIRE PREVENTION PERMITS | | | Permit Fee | $30.00 | | ADDITIONAL FEE | | | Permit fees shall be increased by one hundred percent (100%) for permits obtained after work has been commenced in accordance with Section 108.4. |
a. The aggregate of areas and areas of floors, where applicable, within the scope work of the permit.b. Separate individual trade permits are required in conjunction with these permit.c. Additional individual trade permits shall be required as applicable.
|